GWF project
The Greater Western Flank (GWF) area is located on the North West Shelf of Australia over 60km SW of Goodwyn Alpha Platform. The GWF field is consisting of two production manifolds and two skids.
IDEA Engineering AS was given the responsibility by FMC Technologies Singapore Pte Ltd for performing Large Bore Piping analysis and structural analysis for the Tidepole and GDA manifolds as parts of the Woodside Greater Western Flank (GWF-01) Project.
Pazflor project
The Pazflor consists of three subsea separation units (SSU), at water depth of 800 meters in Block 17 offshore Angola.
IDEA Engineering AS was given the responsibility by FMC Technologies for performing the structural analaysis and installation analysis for all structural components of the Pazflor Subsea Separation Unit
Tordis IOR project
IOR = Increased Oil Recovery.
The Tordis IOR-project is the first commercial full scale subsea separation installation in the world.
Idea Engineering AS was given the responsibility by FMC Technologies for performing the structural analaysis and installation analysis for the structural components of the follwing units of the Tordis IOR project:
– Pipeline In-line Module (PLIM) incl. Foundation Bottom Structure (FBS)
– Subsea Separation Boosting and Injection System (SSBI):
Retrievable Separator Tank Module
Manifold Module
Foundation Bottom Structure incl. Integrated Protection Structures.
Have a look at video showing the installation of SSBI.
Ormen Lange project
Idea Engineering AS was given the responsibility by FMC Technologies for performing the structural analaysis and installation analysis for the Foundation Bottom Structure (FBS).